Assignment Notifications

The Job Scheduler's Assignment Notifications feature provides the ability to send e-mails to selected users detailing their project and task assignments. Employees only see their own assignments and only for the specified reporting date identified in the e-mail.

 

Prerequisite:

 

Sample e-mail sent to employees

To create an assignment notification:

  1. Select Job Scheduler from the menu (Menu > Setup tab > Job Scheduler).

  2. Select Notification from the drop-down list at the top left corner of the screen. If Notification was previously selected, then click the New button on the toolbar.


    The Job Scheduler window opens.

    On the Data (Step 1) tab

  3. Enter a name for this assignment notification job (up to 100 characters).

  4. (Optional) Enter a description (up to 250 characters).

  5. Select Assignment Notification from the Notification Type drop-down list.

  6. Select a Date Range from the drop-down list.

    The Date Range specifies which assignments are included in the e-mail based on each assignment's start and finish dates.

  1. (Optional) Modify the text shown in the e-mail by clicking on the Change Notification Text... link.

 

On the Recipients (Step 2) tab

  1. From the Employees available list box, select the employees that are to be notified and move them to the Employees selected list using the Move button .
     

Note: Only employees with e-mail addresses entered in their respective properties windows are displayed in the Employees available list box.

 

 

On the SMTP (Step 3) tab

  1. SKIP THE SMTP (Step 3) TAB. Do Not Edit the information displayed in this tab.


    On the Schedule (Step 4) tab

  2. Set the Run schedule properties. This establishes when the Job Scheduler runs the job.

Note: If your local time is different than the time on the hosted server, then the server time is displayed in parentheses to the right of the time field.

 

  1. Click Done. The notification job is now displayed in the Job Scheduler's list of jobs.

 

 

Note: All time fields in the Job Scheduler must use the 24 hour format; 23:00 instead of 11:00 PM.

 

Tip: It’s a good practice to set automated job run times when the system demands are low (evenings, overnight or other non-peak times).